Up DShannon » Epic Craft

email Dave Braun at dave@dbraun99.com (click here)

Fuel Cap contour 01
Fuel Cap contour 02
Mold Production 01
Mold Production 02
Mold Production 03
Mold Production 04
Mold Production 05
Mold Production 06
In Mold Electric Heat
Vacuum Bag Silicone Sheet 01
Vacuum Bag Silicone Sheet 02
Vacuum Bag Silicone Sheet 03
Vacuum Bag Silicone Sheet 04
Cloth Weave 01
Cloth Weave
Cloth Rack
Resin Tanks and distribution 01
D'Shannon Supplied Racks 01
Meeting and traveler notes
Tip Tank RFC 02
Tip Tank RFC 03
Tip Tank RFC 04
Tip Tank RFC 05
Tip Tank RFC 06
Tip Tank RFC 01
Resin cooler 01
Resin cooler 02
counter molds for LH closeout sans pocket 02
counter molds for LH closeout sans pocket 01
Counter molded LH cuff wo pocket
outboard half with retainers
Lara w baby
Epoxy injector using large tube 01
Epoxy injector using large tube 02
cuff closeout fit 01
cuff closeout fit 02
Bonding Cuff Closeout 01
Bonding Cuff Closeout 02
Bonding Cuff Closeout 03
Glassing in Cuff Closeout and pocket 02
Glassing in Cuff Closeout and pocket 03
Glassing in Cuff Closeout and pocket 04
Glassing in Cuff Closeout and pocket 05
Glassing in Cuff Closeout and pocket 06
Glassing in Cuff Closeout and pocket 07
Glassing in Cuff Closeout and pocket 08
Glassing in Cuff Closeout and pocket 09
Glassing in Cuff Closeout and pocket 10
Glassing in Cuff Closeout and pocket 11
Glassing in Cuff Closeout and pocket 12
Glassing in Cuff Closeout and pocket 13
Glassing in Cuff Closeout and pocket 14
Glassing in Cuff Closeout and pocket 15
Glassing in Cuff Closeout and pocket 16
Glassing in Cuff Closeout and pocket 17
Glassing in Cuff Closeout and pocket 18
Glassing in Cuff Closeout and pocket 01
Installing baffles outboard half 02
Installing baffles outboard half 03
Installing baffles outboard half 04
Installing baffles outboard half 05
Installing baffles outboard half 06
Installing baffles outboard half 01
Laying up cuff closeout old way
Laying up cuff closeout old way 2
Laying up cuff closeout old way 3
Laying up cuff closeout old way 4
Laying up cuff closeout old way 01
Laying up cuff closeout old way 02
Laying up cuff closeout old way 03
Vector Mat
BFG 7725
mat
mat
Hexcel 7781
Production Boom Truck parts 01
Production Boom Truck parts 02
The boss works too 01
The boss works too 02
The boss works too 03
Two Piece Molds 2
Two piece molds
Cuff closeout molds
Inboard half
Wing interface fittings
Peel Ply Material from Gary Hunter 01
Peel Ply Material from Gary Hunter 02
Tail laminate
Vacuum System 01
Vacuum System 02
Vacuum System 03
Vacuum System 04
cuff closeout epoxy
Cuff
DShannon stock of metal parts and epoxies
Inboard halves ready for metal lines
Precision Green Painters tape  02
Precision Green Painters tape  03
Precision Green Painters Tape 01
Electric heat feature aids curing
Cleaning threads with class 8 nut 01
Cleaning threads with class 8 nut 02
Fitting ground strap 01
Fitting ground strap 02
Fitting ground strap 03
Fitting ground strap 04
Deburring wire lines 01
Deburring wire lines 02
Fitting tubes 01
Fitting tubes 02
Fitting tubes 03
Fitting tubes 04
Fitting tubes 05
Fitting tubes 06
Fitting tubes 07
Fitting tubes 08
Fitting tubes 09
Fitting tubes 10
Fitting tubes 11
Fitting tubes 12
Fitting tubes 13
Confab on metal fittings
Front bulkhead
Grinding at fuel cap boss
Inboard halves on shelving ready for outboard
spatula epoxy with gloves

125 Images | Made with JAlbum & Chameleon | Help