Up MGTD15470 » Progress and Milestones Prev Next Slideshow

 Previous image  Next image  Index page
carburetors assembled jets centered
fuel vent tubes routing RHS 2
Drive shaft complete
fan spacer and pulley in place 4
snow, and the garage is full of MG
  fitting silencer checking clearance.JPG - Checking silencer clearance. I was able to rotate the silencer to its highest position, and still clear the floorboards. I have about a quarter inch of clearance between the chassis and the pipes.  
Wheels and tires mounted on front and on ground-1
engine start engine runs
More wood arrives
Finished handle assy LH-1
Painting hood bows 1

36 | Checking silencer clearance. I was able to rotate the silencer to its highest position, and still clear the floorboards. I have about a quarter inch of clearance between the chassis and the pipes. Download
Total images: 96 | Help