MGTD15470
»
Tub and Wings
» Tub Restoration
email Dave Braun at
dave@dbraun99.com
(click here)
The wood is from Craig Seabrook. It appears to be thicker than the Moss wood others have purchased, and it is giving Brian some grief. The work is progressing slowly.
1
MGT-024
2
repairs to inner front quarter
3
repairs to inner rear quarter
4
Brian holding rear quarter
5
old tub wood saved as reference
6
More wood arrives
7
new tub wood with polyurethan
8
brian fitting new tub wood
9
wood adjustment prior to screws
10
wood screwed to tub frame
11
checking fit of front quarter
12
Test easing rear quarter into place
13
marking fit of rear quarter
14
fuel tank back board
15
front tub wood view
16
squared up tub wood
17
wood alignment issues
18
New wood cowl
19
New wood cowl 2
20
Tub wood ready for metal0001
21
Tub wood ready for metal0005
22
Tub wood ready for metal0002
23
Tub wood ready for metal0003
24
Tub wood ready for metal0004
25
Tub wood ready for metal0007
26
brackets on either side of glove box
27
Cowl fit with windscreen stanchion holes
28
Rear wood shaved
29
Shaving wood on front of tub
30
wood shaved on side
31
Underside of cowl finished
32
wood final shimming and finish0001
33
wood final shimming and finish0002
34
wood final shimming and finish0003
35
wood final shimming and finish0004
36
interior painted quarters
37
Door opening sill too wide0001
38
Door opening sill too wide0002
39
Door opening sill too wide0003
40
Door opening sill too wide0004
41
Brian in front of gate to new shop
42
Volvo P1800 where paint booth is going
43
Tub tucked too far in for working 2
44
Tub tucked too far in for working
45
My parts on the Mezzanine
46
Sidecurtain box hiding under a valance
47
Tub finally out to be worked
48
Angle of cowl to dashboard
49
Fig and I visit Brian
50
Reduced material at sides LH
51
Reduced material at sides RH
52
Shaving sides to close rear gaps
53
easing quarter in place for pinning
54
Grinding out a weld
55
Rear quarter drawn tight with mounting screws
56
Rear quarter pinned
57
Laying down on the job
58
Pinning in rear quarter
59
Pinning rear edge of front quarter
60
Rear edge of front quarter formed against wood
61
Final alignment of rear panel
62
Nails pinning rear quarter bent over
63
Rear panels pinned in place 2
64
Rear panels pinned in place
65
Defining door clearance notch
66
Done for the evening
67
Shaping body fill at corner of cowl
68
Body fill at front and rear quarter seam
69
Rear quarter body fill
70
Rear top rail body fill
71
Front door sill body fill
72
Rear quarter body fill 2
73
Taping interior of tub
74
Taped interior of tub
75
Taped front of tub
76
break for lunch
77
Final shaping top elbow
78
Final smoothing of rear quarter
79
LH side ready for prime 2
80
Preparing cowl for prime
81
Preparing cowl for prime 2
82
LH side ready for prime
83
Shoting tub with prime
84
Shooting tub with prime 2
85
Left hand side primed
86
RH rear quater primed
87
RH rear quarter primed 2
88
Door sill primed 2
89
Door sill primed
90
Tub in color and clear block sanding cowl
91
Tub in color and clear block sanding side 2
92
checking block sanding side
93
checking block sanding cowl
94
Next coat of clear
95
Another sand and clear moment
96
Final clear in makeshift booth 01
97
Final clear in makeshift booth 02
98
Final clear in makeshift booth 03
98
Images | Create
web photo albums
with
Jalbum
|
Chameleon
skin |
Help