Up MGB1970 » Restoration » Body » Paint Prev Next Slideshow

 Previous image  Next image  Index page
High build primer completed ready for block sanding 05
Block Sanding the high build primer 01
Block Sanding the high build primer 02
Block Sanding the high build primer 03
Final Minor fill prior to pimer sealer
  Fill on door prior to sealer.jpg - Additional effort was put into the RH door panel at the site of the crack of doom. Eventually a fnal coat of light filler was placed to level the entire surface, much better than from the factory.  
Passivating the rust and metal 01
Passivating the rust and metal 02
Car ready for Primer Surfacer
DPS3055 Primer Surfacer prep 01
Engine bay taped up and ready for DPS3055

16 | Additional effort was put into the RH door panel at the site of the crack of doom. Eventually a fnal coat of light filler was placed to level the entire surface, much better than from the factory.
Image | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | > | »
Total images: 97 | Help