Up MGTD15470 » Progress and Milestones Prev Next Slideshow

 Previous image  Next image  Index page
first coat of paint
mating gearbox to engine 2
after cleaning 2
carburetors assembled jets centered
fuel vent tubes routing RHS 2
  Drive shaft complete.JPG - Completed the Propeller shaft. Aligned the zerk holes with the relief in the yokes before installing the U-Joints. Put the splined yoke on in the same plane as the flange yoke.  
fan spacer and pulley in place 4
snow, and the garage is full of MG
fitting silencer checking clearance
Wheels and tires mounted on front and on ground-1
engine start engine runs

33 | Completed the Propeller shaft. Aligned the zerk holes with the relief in the yokes before installing the U-Joints. Put the splined yoke on in the same plane as the flange yoke. Download
Total images: 96 | Help