Up MGTD15470 » Progress and Milestones Prev Next Slideshow

 Previous image  Next image  Index page
Finally a decent left hand door fit
Firewall perfect clear coat
Tub in color and clear block sanding cowl
Door fit LH outside
Firewall wired except for grounds
  Firewall and tub mated 1.jpg - The tub finally arrives from the painter. Some serious problems with door fit, paint quality and alignment with the cowl come to light. It would have been advisable to fix these problems before painting the tub was attempted.  
Inspecting completed panels
Garage filled with MG parts again
After test fitting restoring flange
Final main paint repair
Wings and windscreen on

57 | The tub finally arrives from the painter. Some serious problems with door fit, paint quality and alignment with the cowl come to light. It would have been advisable to fix these problems before painting the tub was attempted. Download
Total images: 96 | Help