Up MGTD15470 » Progress and Milestones Prev Next Slideshow

 Previous image  Next image  Index page
Cover off
Finally empty gearbox
Safety wire for selector shaft
clutch rod after improvement
Head on work table
  checking fit of rear seal and crank mains.JPG - Checking fit of rear seal and crank mains. After balancing the crank, matching the pistons and rods for weight, and rebuilding the head the engine is built up.  
timing chain installed to set valves
Wood stove stoked up for painting
first coat of paint
mating gearbox to engine 2
after cleaning 2

25 | Checking fit of rear seal and crank mains. After balancing the crank, matching the pistons and rods for weight, and rebuilding the head the engine is built up. Download
Total images: 96 | Help