Up MGTD15470 » Tub and Wings » Firewall and Toe Board Slideshow

email Dave Braun at dave@dbraun99.com (click here)
The firewall and toe board presented their own problems. The firewall had holes from the Arnolt heater which I was not installing, and the toe board had an expedient snip to facilitate removing the gearbox. These and other flaws needed correcting, and the firewall and timbers fitted to the front of the tub.

battery box goop 3
cowl heater hose plugs
firewall lift the dot fastners
lower firewall paint
Welding missing captive nut onto toe board
Grinding toe board weld
Toe board repair painted
repairs to upper firewall
firewall with more fill
my firewall and sides 2
Firewall and battery tray repairs
Tool box covers and inner wing
Test fitting front top and side rails
Shaping front top rail
Drilling holes to mount the front rails
Attaching front side rails
Firewall to tup location ponits
Assuring wood fits bonnet
Final shaping of top rail on car
Checking fit of tool box covers
Marking remainder of tub to firewall holes
Front rails attached and holes for firewall drilled
Lack of wood in top corner
Lack of wood in top corner 2
Front rail final coat of color and clear
final firewall fill and prime
Firewall perfect clear coat
Firewall perfect clear coat 2
Firewall set up to build front
Firewall loaded to come home
Firewall set up to build.rear
Firewall built up ready for tub
Tool box felt lining pattern
Tool box felt lining patter back and front
Tool box felt lining checking pattern fit
Using square to cut felt
Tool box felt lining cut
Tool box felt lining bottom and sides installed
Tool box felt lining installed 2
Tool box lined with plastic to protect felt lining
patent plate in place
Wooden battery tray painted
Battery tray pre-installed
Routing oil pressure line
Battery tray over oil pressure line 01
Redoing RH cable route

46 Images | Create web photo albums with Jalbum | Chameleon skin | Help