|
25 | The tub has been brought to Mike Speidel's for repair of the cowl line, repair of the hinge lines, to finish sizing the doors, and most importantly to remove the interference fit between the doors and the door openings which Brian introduced. The paint also needs a complete work over to solve a multitude of problems from it being too thick (up to .025 in spots) to having a poor surface finish and lacking clear in critical areas such as the underside of the wings and running boards. | |
Total images: 46 | Help |