Photos D4835
»
Instrument Panel and related Gear
»
New Panel
» Circuit Breakers and Wiring
Dave Braun at
dave@dbraun99.com
(click here)
The old strobe switch.
Slightly injured ELT wiring for in-panel switch.
Picking up wires in the bundle.
2024-02-10 17.16.45
Testing sample circuit breaker panels and bus bars.
2024-03-05 10.35.30
2024-03-07 20.27.05
2024-03-07 20.26.47
The old push to reset circuit breakers, most...
Firewall air shut off coming out as well. It prevented...
Horns for landing gear warning and stall warning.
Where the firewall air cable penetrates the firewall.
The firewall shut off cable is attached through this one...
RH circuit breaker panel ready for wiring and mounting.
Cleaned up wiring ready for transfer to new breakers.
On going progress on RH breaker panel. The Yellow cable...
Working on the LH breaker panel which serves the...
The tools of the trade.
The instrument panel is in, along with the Approach Fast...
2024-10-20 17.15.10
The Apporach Fast Stack harness for the avionics behind...
2024-10-20 18.37.13
2024-10-20 18.37.34
Mic and Phone audio panel harness ready to feed to their...
2024-10-22 15.12.46
The ground bus to bring all the voltage potentials to one...
Wiring behind the panel, it turned out a bit more...
Before wiring clean up.
RH Circuit breaker panel ready for installation as soon...
Autopilot wiring harness, also from Approach Fast Stack,...
Working out the wiring for communicating the GPS with the...
RH Breaker panel ready for installation.
Power receptacle for the B-Kool in the rear of the...
2024-11-02 11.00.25
2024-11-02 11.30.25
Since the rear panel is removable, the power receptacle...
2024-11-02 11.32.47
Wiring the GSB 15 USB panel connector for charging cell...
38
Images | Create
web photo albums
with
Jalbum
|
Chameleon
skin |
Help