Up MGTD15470 » Tub and Wings » Tub Installation Prev Next Slideshow

 Previous image  Next image  Index page
Checking the hole clearence and angle
Moved to Speidels
Inspecting progress
Tub repair to fit doors and align hinges
Tub repair to fix cowl line
  Inspecting progress 2.jpg - Tub after the repair of the cowl line at the right hand side.  
Reparis complete masking for paint 02
Reparis complete masking for paint 01
Finishing body fill application
Painting line up for tub repair
DBU paint requires DRR reactive reducer

28 | Tub after the repair of the cowl line at the right hand side. Download
Total images: 46 | Help