Up MGTD15470 » Weather Equipment » Tonneau Installation Prev Next

 Previous image  At last page  Index page
LTD punch
Bending tabs on LTD
LTD installed
Ready to work on side
marking location for stud
  Tonneau installed.jpg - The installed tonneau. I would place the fartherst aft side fastner a bit lower as it is close to the installed hood. This wasn't apparent when I installed the tonneau because the hood was stowed. The middle aft side fastner should have a bit less tension on it, and probably be a touch higher on the side panel. The amount of tension is not excessive, but enough to keep the side panels in place over the doors while motoring. Note that there are no fastners on the doors themselves.  
 
 
 
 
 

8 | The installed tonneau. I would place the fartherst aft side fastner a bit lower as it is close to the installed hood. This wasn't apparent when I installed the tonneau because the hood was stowed. The middle aft side fastner should have a bit less tension on it, and probably be a touch higher on the side panel. The amount of tension is not excessive, but enough to keep the side panels in place over the doors while motoring. Note that there are no fastners on the doors themselves. Download
Total images: 8 | Help