Up MGTD15470 » Weather Equipment » Side Curtains Prev Next Slideshow

 Previous image  Next image  Index page
Pencil frame tracing 01
Trimming on the pencil lines 01
Trimming on the pencil lines 02
Drilling through the lexan and fabric
Checking fit of framework
  Placing captive carriage bolts into strip.jpg - The carriage bolts are held captive by the side strips. On a TC the strips are mitred by hand. On the TD/TF the strips have these little pointed ends. Lay out all the strips and decide which ones go where. Four are of identical length and match up to the matting surfaces of the fore and aft side curtains. The rear top strips need to be hand bent by thumb pressure to fit the curve of the frame.  
tightening nuts
Dave demonstrating a scowl
Increasing depth of trim
Ready for test fitting
Bending split rivets over the washer

41 | The carriage bolts are held captive by the side strips. On a TC the strips are mitred by hand. On the TD/TF the strips have these little pointed ends. Lay out all the strips and decide which ones go where. Four are of identical length and match up to the matting surfaces of the fore and aft side curtains. The rear top strips need to be hand bent by thumb pressure to fit the curve of the frame. Download
Total images: 60 | Help