Up MGTD15470 » Engine XPAG TD2 15613 » Building XPAG TD2 15613 Prev Next Slideshow

 Previous image  Next image  Index page
checking fit of rear seal and crank mains
Installing main bearing studs with eccentric driver
bottom rings in still need upper rings
Installing rings
Next is the head
  rocking head in place.JPG - Rocking the head in place. Note the notation on the side of the block that says 'drill'. The rear water passage had the 3/16th hole. We just assured that it was clear. I had the machinist drill a second hole in the front. I got the idea originally from the TC website. It is supposed to promote coolant flow in the block.  
crowned and polished tappets
Pushrods and rockers in place
timing chain installed to set valves
Engine ready to take home to finish
Engine on stand ready to be finished

22 | Rocking the head in place. Note the notation on the side of the block that says 'drill'. The rear water passage had the 3/16th hole. We just assured that it was clear. I had the machinist drill a second hole in the front. I got the idea originally from the TC website. It is supposed to promote coolant flow in the block. Download
Total images: 28 | Help