Up Spitfire1974 » Restoration » Engine » Engine Installation Prev Next Slideshow

 Previous image  Next image  Index page
Engine in place for move (3)
Rear engine (gearbox) mounts
Ready for more work
Getting oil pressure as shown at rockers (2)
Setting valves to 010
  Bedding cam and setting up timing and fuel (1).JPG - 2000 RPM for 20 minutes to bed the cam. The mechanical tach was pretty much inline with the dwell tach (although the mecvhanical tach is not yet installed, I tested it in my hand).  
Bedding cam and setting up timing and fuel (3)
 
 
 
 

24 | 2000 RPM for 20 minutes to bed the cam. The mechanical tach was pretty much inline with the dwell tach (although the mecvhanical tach is not yet installed, I tested it in my hand). Download
« | < | 21 | 22 | 23 | 24 | 25 |
Total images: 25 | Help